Prince Sultan City for Humanitarian Services - Construction of Child Development Center and Mosque

Project Details
  • Client: Sultan Bin Abdulaziz Al Saud Foundation
  • Location: Riyadh
  • Starting Date: March - 2000
  • Completion Date: October - 2002
  • Contract Value: SAR 32,165,294
  • Contract Value: USD 8,577,412
  • Scope of work: Civil and Electro Mechanical
Project Info

 The scope of work covered under Child development Center (E1) and Mosque (R1) includes, but not limited to, the following infrastructure works:

C.D.C (E1)
 All requirements to construct the CDC excluding medical equipment. Construction of the following; adjacent guardhouse, including all utility connections to the CDC adjacent LPG gas storage tank holding structures and LPG tank and interconnecting pipe to the building: the main incoming power supply cable from substation LA to the CDC including the connection to the switchgear at substation LA; the external connections at telephone, coaxial fire alarm, data links from building S1 to CDC.

 All requirements to construct the mosque, which also cover external fountain including pipe and pumps; the stone facing to the battered RC wall adjacent to Building S5; the incoming connections of all services (irrigation mainline, potable water supply, sanitary and stormwater pipes, chilled water supply, power supply) shall terminate 2 meters from the building or the nearest manhole whichever is the closest; RC retaining walls and all paving and landscaping furniture.