Construction of Lab R and D Center-Phase 1

  • Construction of Lab R and D Center-Phase 1

  • Construction of Lab R and D Center-Phase 1

  • Construction of Lab R and D Center-Phase 1

  • Construction of Lab R and D Center-Phase 1

  • Construction of Lab R and D Center-Phase 1

  • Construction of Lab R and D Center-Phase 1

  • Construction of Lab R and D Center-Phase 1

Project Details
  • Client: Saudi Arabian Oil Company
  • Location: Dhahran
  • Starting Date: December - 1998
  • Completion Date: March - 2001
  • Contract Value: SAR 156,137,392
  • Contract Value: USD 41,636,640
  • Scope of work: Architectural, Civil and Electro Mechanical Works and Special Equipment
Project Info

 The project consists of general contractor services and civil engineering construction of a science & technology exhibition & educational site / building. The project site is approx. 21,700 m2 and the building design is approx. 14,750 m2 enclosed, on 3 major and 1 minor interior level, with ground floor coverage of approx. 6,600 m2. This contract covers the material procurement and construction of pre-engineered steel structures.

Buildings:

  • Construction of three – story General Laboratory Building with partial basement, two – storey High Bay Building, sun-shade storage area and utility yard, site covered walkways laboratory casework and furniture, off – loading and installation of office furniture, building maintenance equipment.

Utilities:

  • Electrical service and electrical transformers to provide power to proposed General Lab Building High Bay Buildings.
  • Complete Voice and Data Communication Systems, cabling and equipment inside of the building, raw water, drinking water, firewater, laboratory waste and wastewater piping, water cooled central chilled water plant and associated cooling towers, Building Management System, Fire Alarm and Detection System. Fire suppression system for site, Installation and removal of all temporary communication services. Installation of 6” dia. sewer force main from chiller plant to existing manhole on existing 15” dia. concrete sewer line, installation of new 10” dia. gravity main from laboratory buildings to NDT Technology Center lift station, demolition of existing lift station and associated piping serving MSO hammam. Construction of a new 4 x 3-6” conduit electrical concrete encased duct from the manhole at north end site provided by the NDT Building. Installation of 4 – way SF – 6 switches at the Central Plant for the power supply of this project. Provide stand by Emergency Generator, Installation of drainage systems for sanitary wastes, laboratory wastes, neutralization system and oily waste holding tank.